In the paper the reliability of a transient test-based technique as a powerful tool in the management of real supply pipe systems is shown. The pressure signal acquired during the first phase of the single carried out test has been analyzed on the basis of the extensive research activity, that in the last years has been carried out in the field of transient test-based techniques and refined on the basis of numerical and laboratory tests. Specifically, the Wavelet Transform — which allows the automatic detection of singularities also in noisy pressure signals — and a Lagrangian Model — which evaluates the causes of discontinuities — are efficiently coupled also for analysing the pressure signal acquired in the described pipe system. As a result, the topology of such a system has been checked and its functioning conditions have been determined. Moreover, the unwanted status of an in-line valve — certified by the manager as fully open but actually partially closed — has been pointed out.
Potential of Transient Tests to Diagnose Real Supply Pipe Systems: What Can Be Done with a Single Extemporary Test
MENICONI, SILVIA;BRUNONE, Bruno;FERRANTE, Marco;MASSARI, CHRISTIAN
2011
Abstract
In the paper the reliability of a transient test-based technique as a powerful tool in the management of real supply pipe systems is shown. The pressure signal acquired during the first phase of the single carried out test has been analyzed on the basis of the extensive research activity, that in the last years has been carried out in the field of transient test-based techniques and refined on the basis of numerical and laboratory tests. Specifically, the Wavelet Transform — which allows the automatic detection of singularities also in noisy pressure signals — and a Lagrangian Model — which evaluates the causes of discontinuities — are efficiently coupled also for analysing the pressure signal acquired in the described pipe system. As a result, the topology of such a system has been checked and its functioning conditions have been determined. Moreover, the unwanted status of an in-line valve — certified by the manager as fully open but actually partially closed — has been pointed out.I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.